It was time for a new liner in one of our hybrid swimming pools (built by Ask the Pool Guy’s construction division Legendary Escapes). We also took this opportunity to redo the sun ledge and slide to ecofinish – they turned out great!
The homeowner wanted the pool filled quickly, but timing wouldn’t work for a water truck as they were all booked out about a month – so in the hose went to get water into the pool. The iron content in the well water is super high – but we added FerriTabs, ran the water through the system with a sand filter, backwashed, and repeated the process. The pool will be party ready for a huge birthday this weekend!
A couple of photos to show you the new liner, the orange lid on the check valve showing just how much iron is in this water, and the pool today before our service tech vacuumed the rest of the iron sediment out of the pool.